Open Frame 10KW Standby Gasoline Power Generator With 2 - Cylinder , 995*630*790mm
Product Details:
Place of Origin: | Wuxi of China |
Brand Name: | KAIAO |
Certification: | CE |
Model Number: | KGE12E |
Payment & Shipping Terms:
Minimum Order Quantity: | 10 units |
---|---|
Price: | US$1680.FOB.Shanghai |
Packaging Details: | Wooden case |
Delivery Time: | 25 working days |
Supply Ability: | 1000 units per month |
Detail Information |
|||
Model: | KGE12E/10KW Kohler Gasoline Generator Set | Type: | 2-Cylinder Air-cooled Diesel Engine Set |
---|---|---|---|
Frequency: | 50HZ | Rated Power(KW): | 10KW |
Max Power(KW): | 11KW | Voltage: | 220/230V |
Current(A): | 43.5A | Speed: | 3000/3600rpm |
Phase: | AC Single Phase | Power Factor: | 1 |
Structure: | Open-frame | Engine Type: | OHV,V-twin Cylinder,air-cooled.4-stroke |
Fuel Tank Capacity(L): | 25L | Weight(Kg): | 158Kg |
Dimension(L*W*H): | 995*630*790mm | ||
Highlight: | Open Frame 10KW Gasoline Power Generator,standby Gasoline Power Generator,Gasoline Power Generator 995*630*790mm |
Product Description
10KW AC Single phase KOHLER gasoline generator set 50/60HZ
All generators are equipped with original USA Kohler air-cooled petrol engines
Control Panel
All control units are set on one panel and Digital control panel is optional which will display the running data including output voltage, current, running hours etc.
Low oil alarm system
Before the fuel level drops to the limited level, the generator will stop automatically and it can be restarted only if the fuel is refilled.
Application of AVR
The AVR (Automatic Voltage Regulator) can ensure the output to be smooth and provide reasonable protection against the overload of the generator to avoid damage the set.
Advanced Alternator
100% copper wire, waveform distortion is kept at a Min. level and the output is stable.
ATS System
The ATS system (Automatic Transfer Switch) will give commands to start the genset automatically if the Mains Power fails or the voltage & frequency of the mains power become abnormal. As the mains power is restored, ATS shifts the load back to the mains power and shuts down the genset.